Megha Engineering And Infrastructure Recruitment
Company Name :- Megha Engineering And Infrastructure
M/s. SEPC Power Private Limited (the SEPC) Setting up of the Tuticorin Thermal Power Project Stage IV 1×525 MWWe are setting up the above project within VO Chidambaranar Port Trust Estate at Thoothukudi, Thoothukudi District, Tamilnadu.
The entire Power generated from the above Project is to be given to Tamilnadu Generation & Distribution Corporation Limited (the TANGEDCO) for meeting the power requirement of the state of Tamilnadu.
Position :- Electrical Operator/Technician
Qualification :- Diploma/ITI (Electrical)
Experience :- 5- 8Years
Job Location :- Thoothukkudi/Tuticorin
Salary :- Not Disclosed
Job Description :-
Apply Link :- Click here
Disclaimer :- This material or information has been placed on our website for the convenience of our visitors. We does not guarantee or give any kind of assurance or authentication for the above said job posting. Candidates are requested to verify on their own.
DO Not Pay Any Charges For The Jobs.
The Sage Group of Industry Mandideep Campus Placement 2024 | Shift In Charge, Operator |…
Rashtriya Chemicals and Fertilizers Ltd Recruitment 2023 | Graduate/Technician/Trade Apprentice | 12th/any degree/B.Sc/Diploma | 165…
Bajai Motors & Passenger Electric Mobility Campus Placement 2024 | Freshers | 10, 12, ITI,…
Indo-Tibetan Border Police Force Recruitment 2024 Constable/Tradesman | 10th/ITI/Diploma | 51 Posts | Last Date:…
Dixon Technology & 3 Other Company’s Campus Placement 2024 | Freshers | ITI Pass |…
Honda Siel Power Products Limited Campus Placement 2024 | Freshers | ITI Pass | 100…